Mwangeji double road interchange

Civil engineering, Electricity

Client: Province of Lualaba
Contracting Authority: EGMF
Design Office:
Fally & Associés SA
Description: Construction of a double road interchange at the current Mwangeji roundabout.
Planned Start of Works: 2025

Additional Information:

  • Construction of 5 bridges.

  • Development of 1,697 meters of roads (variable profiles from 1 to 3 lanes) for the bridges.

  • Development of 1,833 meters of roads (variable profiles from 2 to 4 lanes) for the connecting ramps to existing avenues.

  • Installation of 135 solar-powered lights on the bridges and 107 solar-powered lights on the roundabout and connecting ramps — lighting fully supplied and installed by Congo Energy.

  • Construction of a symbolic vertical structure (architectural landmark)

This will be the first double road interchange in the Democratic Republic of the Congo.

3D visualization of the Mwangeji double road interchange project in Kolwezi, DR Congo

Architectural simulation of the Mwangeji double road interchange in Kolwezi, DR Congo.

The Mwangeji double road interchange in Kolwezi will be the first in DR Congo.

Project of the Mwangeji double road interchange in Kolwezi, DR Congo.

Night virtual simulation of the construction project of the Mwangeji double road interchange in Kolwezi, DR Congo.