Interchange Kolwezi airport

Civil engineering, Electricity, Roads

Client :  Lualaba Province 
Contractor : EGMF
Description : Construction of a road interchange 
Date : 2022
Additional informations :

  • Construction of 2.5 km of asphalt road over a width of 15.50 m (including shoulders).
  • Construction of 2 bridges: one 57m above the RN39, the other 21m above the railway
  • Use of a new slope stabilization method, the patented ATALUS system, with a license granted to EGMF for the site. The Atalus system makes it possible to have a slope at 71° instead of the conventional 27° (2/1), which considerably reduces expropriations.

The 1st road interchange in Kolwezi, built by the Groupe Forrest

Construction of the Kolwezi interchange bridge, Lualaba, DRC

ATALUS patented system on the Kolwezi interchange, DRC

Construction of the Kolwezi interchange bridge, Lualaba, DRC

Construction of the Kolwezi interchange bridge in 2023