Mwangeji multi-level stack interchange

Civil engineering, Electricity

Client: Province of Lualaba

Contracting Authority: EGMF

Design Office: Fally & Associés SA
Description: Construction of a two-level interchange at the current Mwangeji roundabout.
Planned Start of Works: 2025

Additional Information:

  • Construction of 5 bridges.

  • Development of 1,697 meters of roads (variable profiles from 1 to 3 lanes) for the bridges.

  • Development of 1,833 meters of roads (variable profiles from 2 to 4 lanes) for the connecting ramps to existing avenues.

  • Installation of 135 solar-powered lights on the bridges and 107 solar-powered lights on the roundabout and connecting ramps — lighting fully supplied and installed by Congo Energy.

  • Construction of a symbolic vertical structure (architectural landmark)

This will be the first multi-level stack interchange in the Democratic Republic of the Congo.