Mwangeji multi-level stack interchange
Client: Province of Lualaba
Contracting Authority: EGMF
Design Office: Fally & Associés SA
Description: Construction of a two-level interchange at the current Mwangeji roundabout.
Planned Start of Works: 2025
Additional Information:
-
Construction of 5 bridges.
-
Development of 1,697 meters of roads (variable profiles from 1 to 3 lanes) for the bridges.
-
Development of 1,833 meters of roads (variable profiles from 2 to 4 lanes) for the connecting ramps to existing avenues.
-
Installation of 135 solar-powered lights on the bridges and 107 solar-powered lights on the roundabout and connecting ramps — lighting fully supplied and installed by Congo Energy.
-
Construction of a symbolic vertical structure (architectural landmark)
This will be the first multi-level stack interchange in the Democratic Republic of the Congo.