Rehabilitation of 3 groups of the Sanga hydroelectric plant
The turbo-alternator units 1, 4 and 6 of the Sanga hydroelectric power station have been put back into service and produce electricity, injected into SNEL’s national network.
- Partager
The turbo-alternator units 1, 4 and 6 of the Sanga hydroelectric power station have been put back into service and produce electricity, injected into SNEL’s national network.