{"id":2459,"date":"2019-05-06T10:14:42","date_gmt":"2019-05-06T08:14:42","guid":{"rendered":"http:\/\/forrestgroup.lademo.be\/centre-negoce-kolwezi-chantier-demarre\/"},"modified":"2019-09-18T12:26:29","modified_gmt":"2019-09-18T10:26:29","slug":"kolwezi-trading-center-construction-work-has-started","status":"publish","type":"post","link":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/","title":{"rendered":"Kolwezi Trading Centre: construction work has started"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-930 size-full alignnone\" src=\"http:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg\" alt=\"\" width=\"1560\" height=\"987\" srcset=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg 1560w, https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce-300x190.jpg 300w, https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce-768x486.jpg 768w, https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce-1024x648.jpg 1024w\" sizes=\"auto, (max-width: 1560px) 100vw, 1560px\" \/><\/p>\n<p class=\"p1\"><span class=\"s1\">In Kolwezi, the construction of the future <strong>Trading Centre<\/strong> has begun. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">This large-scale project, covering a total area of 15,000 m\u00b2 is led by the Governor of Lualaba, Richard Muyej. This centre will offer a place of commerce and trade for artisanal diggers, now selling around the National road, at the entrance to the town.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The Trading Centre will comprise sheds, administrative buildings, a service station, a restaurant and parking facilities for heavy trucks with a capacity of 100 vehicles.\u00a0 The Centre will also have a laboratory to test the ores.<span class=\"Apple-converted-space\"> \u00a0<\/span><\/span><\/p>\n<h2>Construction of access roads<\/h2>\n<p class=\"p1\"><span class=\"s1\">The topographic and geotechnical studies of the site have been carried out by EGMF.\u00a0 The teams then focused on the excavation work (cuttings, embankments, banks) and <strong>road construction<\/strong>. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Two access roads will be made, with respective lengths of 1.7 and 1.2 km. These access roads will connect the Trading Centre to the National road. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Inside the centre, EGMF is responsible for making the main roads, secondary roads, and also the roadside shoulders. Bends will be made of reinforced concrete to limit wear of the road caused by heavy truck traffic. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">In addition to the roads and access roads, EGMF is responsible for creating 2 parking areas: a truck park for heavy trucks with 100 spaces and a car park for the administrative staff. As well as the road surfaces, EGMF will also provide the <a href=\"http:\/\/forrestgroup.com\/product\/beton\/produits-beton\/\"><span class=\"s2\">high kerbs<\/span><\/a> (supplied by its prefabrication department) and amenities for pedestrians: paths made of <a href=\"http:\/\/forrestgroup.com\/product\/beton\/paves-beton\/\"><span class=\"s2\">pavers<\/span><\/a>, greenery, etc.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The construction of a weighbridge has also been entrusted to EGMF\u2019s teams.<span class=\"Apple-converted-space\">\u00a0 <\/span>As well as the supply of a <a href=\"http:\/\/forrestgroup.com\/product\/metal-aluminium\/location-de-container\/\"><span class=\"s2\">fitted-out container<\/span><\/a> for the guard post. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">In phase 2 of the project, the construction work for the sheds will be carried out by NBLIA.<\/span><\/p>\n<h2 class=\"p1\"><span class=\"s1\">Sanitation and water pipes<\/span><\/h2>\n<p class=\"p1\"><span class=\"s1\">The contract with EGMF also comprises a drainage plan, including the construction of a main drain over the entire length of the centre, as well as secondary drains. The drainage system will be completed by <a href=\"http:\/\/forrestgroup.com\/product\/beton\/produits-beton\/\"><span class=\"s2\">concrete water gutters<\/span><\/a> and the installation of <a href=\"http:\/\/forrestgroup.com\/product\/beton\/buses-beton\/\"><span class=\"s2\">concrete pipes<\/span><\/a>, 100 cm in diameter. All the concrete products used on the construction site are produced by EGMF\u2019s prefabricated department.<\/span><\/p>\n<h3>On site photos (August 2019)<\/h3>\n<div id='gallery-1' class='gallery galleryid-2459 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/forrestgroup.com\/en\/kolwezi-construction-centre-negoce-groupe-forrest-2019-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/09\/kolwezi-construction-centre-negoce-groupe-forrest-2019-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Civil engineering works at Kolwezi Trading Centre, DR Congo\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/forrestgroup.com\/en\/construction-centre-negoce-kolwezi-aout-2019-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/09\/construction-centre-negoce-kolwezi-aout-2019-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"Building construction on Kolwezi Trading Centre\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/forrestgroup.com\/en\/travaux-centre-negoce-kolwezi-egmf-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/09\/travaux-centre-negoce-kolwezi-egmf-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/forrestgroup.com\/en\/construction-centre-negoce-kolwezi-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/09\/construction-centre-negoce-kolwezi-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/forrestgroup.com\/en\/centre-negoce-kolwezi-septembre-2019-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/09\/centre-negoce-kolwezi-septembre-2019-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/forrestgroup.com\/en\/20190914-centre-negoce-kolwezi-2\/'><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/09\/20190914-centre-negoce-kolwezi-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>In Kolwezi, the construction of the future Trading Centre has begun. This large-scale project, covering a total area of 15,000 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":931,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[142,141],"tags":[176],"class_list":["post-2459","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-genie-civil-en","category-construction-en","tag-kolwezi-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Kolwezi Trading Centre: construction work has started | Forrestgroup<\/title>\n<meta name=\"description\" content=\"In Kolwezi, the construction of the Trading Centre has started. The Centre will offer sheds, administrative buildings, a service station and parkings.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kolwezi Trading Centre: construction work has started | Forrestgroup\" \/>\n<meta property=\"og:description\" content=\"In Kolwezi, the construction of the Trading Centre has started. The Centre will offer sheds, administrative buildings, a service station and parkings.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/\" \/>\n<meta property=\"og:site_name\" content=\"Forrestgroup\" \/>\n<meta property=\"article:published_time\" content=\"2019-05-06T08:14:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-09-18T10:26:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1560\" \/>\n\t<meta property=\"og:image:height\" content=\"987\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"private\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"private\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/\"},\"author\":{\"name\":\"private\",\"@id\":\"https:\/\/forrestgroup.com\/#\/schema\/person\/780cee2938b1ebf13b502e48656cc472\"},\"headline\":\"Kolwezi Trading Centre: construction work has started\",\"datePublished\":\"2019-05-06T08:14:42+00:00\",\"dateModified\":\"2019-09-18T10:26:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/\"},\"wordCount\":363,\"publisher\":{\"@id\":\"https:\/\/forrestgroup.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg\",\"keywords\":[\"kolwezi\"],\"articleSection\":[\"Civil engineering\",\"Construction\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/\",\"url\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/\",\"name\":\"Kolwezi Trading Centre: construction work has started | Forrestgroup\",\"isPartOf\":{\"@id\":\"https:\/\/forrestgroup.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg\",\"datePublished\":\"2019-05-06T08:14:42+00:00\",\"dateModified\":\"2019-09-18T10:26:29+00:00\",\"description\":\"In Kolwezi, the construction of the Trading Centre has started. The Centre will offer sheds, administrative buildings, a service station and parkings.\",\"breadcrumb\":{\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage\",\"url\":\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg\",\"contentUrl\":\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg\",\"width\":1560,\"height\":987},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/forrestgroup.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kolwezi Trading Centre: construction work has started\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/forrestgroup.com\/#website\",\"url\":\"https:\/\/forrestgroup.com\/\",\"name\":\"Groupe Forrest\",\"description\":\"-\",\"publisher\":{\"@id\":\"https:\/\/forrestgroup.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/forrestgroup.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/forrestgroup.com\/#organization\",\"name\":\"Groupe Forrest International\",\"url\":\"https:\/\/forrestgroup.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/forrestgroup.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/press-thumbnail.svg\",\"contentUrl\":\"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/press-thumbnail.svg\",\"width\":270,\"height\":190,\"caption\":\"Groupe Forrest International\"},\"image\":{\"@id\":\"https:\/\/forrestgroup.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/forrestgroup.com\/#\/schema\/person\/780cee2938b1ebf13b502e48656cc472\",\"name\":\"private\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/forrestgroup.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f964115d2f672c56036c34d8a3f2e0caefd5b10bf1ba789abb29743a4369d444?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f964115d2f672c56036c34d8a3f2e0caefd5b10bf1ba789abb29743a4369d444?s=96&d=mm&r=g\",\"caption\":\"private\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Kolwezi Trading Centre: construction work has started | Forrestgroup","description":"In Kolwezi, the construction of the Trading Centre has started. The Centre will offer sheds, administrative buildings, a service station and parkings.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/","og_locale":"en_US","og_type":"article","og_title":"Kolwezi Trading Centre: construction work has started | Forrestgroup","og_description":"In Kolwezi, the construction of the Trading Centre has started. The Centre will offer sheds, administrative buildings, a service station and parkings.","og_url":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/","og_site_name":"Forrestgroup","article_published_time":"2019-05-06T08:14:42+00:00","article_modified_time":"2019-09-18T10:26:29+00:00","og_image":[{"width":1560,"height":987,"url":"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg","type":"image\/jpeg"}],"author":"private","twitter_card":"summary_large_image","twitter_misc":{"Written by":"private","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#article","isPartOf":{"@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/"},"author":{"name":"private","@id":"https:\/\/forrestgroup.com\/#\/schema\/person\/780cee2938b1ebf13b502e48656cc472"},"headline":"Kolwezi Trading Centre: construction work has started","datePublished":"2019-05-06T08:14:42+00:00","dateModified":"2019-09-18T10:26:29+00:00","mainEntityOfPage":{"@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/"},"wordCount":363,"publisher":{"@id":"https:\/\/forrestgroup.com\/#organization"},"image":{"@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage"},"thumbnailUrl":"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg","keywords":["kolwezi"],"articleSection":["Civil engineering","Construction"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/","url":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/","name":"Kolwezi Trading Centre: construction work has started | Forrestgroup","isPartOf":{"@id":"https:\/\/forrestgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage"},"image":{"@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage"},"thumbnailUrl":"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg","datePublished":"2019-05-06T08:14:42+00:00","dateModified":"2019-09-18T10:26:29+00:00","description":"In Kolwezi, the construction of the Trading Centre has started. The Centre will offer sheds, administrative buildings, a service station and parkings.","breadcrumb":{"@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#primaryimage","url":"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg","contentUrl":"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/centre-negoce.jpg","width":1560,"height":987},{"@type":"BreadcrumbList","@id":"https:\/\/forrestgroup.com\/en\/kolwezi-trading-center-construction-work-has-started\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/forrestgroup.com\/en\/"},{"@type":"ListItem","position":2,"name":"Kolwezi Trading Centre: construction work has started"}]},{"@type":"WebSite","@id":"https:\/\/forrestgroup.com\/#website","url":"https:\/\/forrestgroup.com\/","name":"Groupe Forrest","description":"-","publisher":{"@id":"https:\/\/forrestgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/forrestgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/forrestgroup.com\/#organization","name":"Groupe Forrest International","url":"https:\/\/forrestgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/forrestgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/press-thumbnail.svg","contentUrl":"https:\/\/forrestgroup.com\/content\/uploads\/2019\/05\/press-thumbnail.svg","width":270,"height":190,"caption":"Groupe Forrest International"},"image":{"@id":"https:\/\/forrestgroup.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/forrestgroup.com\/#\/schema\/person\/780cee2938b1ebf13b502e48656cc472","name":"private","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/forrestgroup.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f964115d2f672c56036c34d8a3f2e0caefd5b10bf1ba789abb29743a4369d444?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f964115d2f672c56036c34d8a3f2e0caefd5b10bf1ba789abb29743a4369d444?s=96&d=mm&r=g","caption":"private"}}]}},"_links":{"self":[{"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/posts\/2459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/comments?post=2459"}],"version-history":[{"count":4,"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/posts\/2459\/revisions"}],"predecessor-version":[{"id":3234,"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/posts\/2459\/revisions\/3234"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/media\/931"}],"wp:attachment":[{"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/media?parent=2459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/categories?post=2459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/forrestgroup.com\/en\/wp-json\/wp\/v2\/tags?post=2459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}